Do You Need a Permit to Build a Deck in Toronto?

When a Toronto deck needs a building permit, what the 60 cm rule means, guard heights, zoning, trees and utility locates. A plain guide for homeowners.

By Stephan Tosevski Published 6 min read
A raised composite deck with wide steps down to a large-format paver patio, a dining set and a barbecue, against a two-storey brick home
A raised composite deck with wide steps down to a large-format paver patio, a dining set and a barbecue, against a two-storey brick home. Photo: Mako Construction project.

A deck looks like a simple project: posts, beams, boards. In Toronto, whether it needs a building permit comes down mostly to one measurement — how high the walking surface sits above the ground — plus a few conditions that catch homeowners off guard. This guide walks through what the City actually asks for, what the Ontario Building Code requires once a deck gets tall, and the other approvals (zoning, trees, utility locates) that apply even when no permit is needed.

If you are planning a deck as part of a larger backyard, our custom decks page explains how we design and build them.

The short answer: the 60 cm rule

The City of Toronto's own list of when a building permit is required includes constructing a deck more than 60 centimetres (24 inches) above ground. Decks are also listed among the additions to an existing building that need a permit.

The same page lists the exception. An uncovered platform does not need a building permit when:

  • its finished deck level is not more than 60 cm (24 inches) above the adjacent finished grade, and/or
  • it does not form part of an exit required under the Building Code, and
  • it complies with the Zoning By-law.

Two details matter here. First, "adjacent finished grade" is measured where the deck actually is — on a sloping lot, a deck that starts at 30 cm by the house can be well over 60 cm at the far edge. Second, the exception is for an uncovered platform. The City separately lists "enclosing an existing deck, porch or patio of any size" as work that requires a permit, and a roof or pergola tied into the deck changes the conversation as well.

Situations that usually mean a permit

Based on the City's list, plan on a permit when any of these apply:

  • Any part of the deck surface is more than 60 cm above grade. Walkout and raised decks almost always fall here.
  • You are enclosing or roofing the deck. Turning a deck into a covered porch, screened room or sunroom is an addition.
  • The deck is part of a required exit from the house.
  • It is built as part of a larger addition to the house.

A low, freestanding platform deck at ground level is the typical no-permit case — but it still has to meet zoning (see below).

What the Building Code requires once you are above 600 mm

Permit or not, the Ontario Building Code sets the safety baseline. Two sentences do most of the work for residential decks:

  • When guards are required. Under OBC Div. B 9.8.8.1, a guard is required on any open side of a walking surface — including decks, porches, landings and stairs — where the difference in elevation to the adjacent surface within 1.2 m is more than 600 mm.
  • How tall guards must be. Under 9.8.8.3, exterior guards serving a single dwelling unit must be at least 900 mm high where the walking surface is not more than 1,800 mm above finished ground. Above that, the general requirement of 1,070 mm applies.

That is why tall decks feel different: once the surface passes 1.8 m, the railing height goes up, and the structure, footings and connections get more scrutiny.

One more Code detail homeowners often miss: as Richmond Hill's deck permit checklist points out, the Ontario Building Code does not allow a deck to be attached to brick veneer. A ledger has to bear on the structure behind it, or the deck has to be freestanding. Toronto applies the same Code.

Zoning applies even without a permit

The City is explicit that compliance with the Zoning By-law is required even when a building permit is not. For decks, zoning typically governs how close you can build to lot lines, how much of the yard can be covered, and how high platforms can sit relative to other structures. For example, Toronto's Zoning By-law 569-2013 does not allow a deck or similar platform on top of an ancillary building such as a cabana or garage.

Zoning varies by property, and some lots carry site-specific exceptions, so we confirm the rules for each address before design is finalized.

Privacy screens on decks

A deck is often where privacy matters most. Toronto's fence by-law, Municipal Code Chapter 447, sets a separate height limit for a fence on an unroofed deck that is not in a front yard and not within 2.4 m of a lot line abutting a street: 2.0 metres above the surface of the deck on residential property. That gives you room for a proper screen, as long as it is designed within that limit. See modern privacy fences in Toronto for more on fence heights.

Trees: a separate permit that catches people out

Many Toronto backyards have mature trees, and decks need footings. Under the City's tree by-law, any activity that can injure or remove a private tree 30 cm or more in diameter (measured 1.4 m above the ground) requires a permit, as the City explains on its tree and ravine permit page. Digging footings, storing materials or driving equipment inside a tree's protection zone counts. If your lot is in a ravine-protected area, trees of all sizes are protected.

A building permit does not authorize tree injury — the two are separate approvals. If a deck is planned near a large tree, involve an arborist early.

Call before you dig

Footings mean digging, and digging in Ontario means a utility locate. Ontario Dig Authority (formerly Ontario One Call) says you must request a locate before you dig — including for a deck — at least five business days ahead for a single-address project. It is free. Private lines, like a gas line to a barbecue or wiring to garden lights, are not covered by public locates and need a private locator.

What a permit application typically includes

Requirements vary by municipality and project, but a deck application generally includes a site plan or survey showing the deck and its distance to lot lines, plus construction drawings: a foundation plan with footing locations, a framing plan with member sizes and spacing, elevations, and sections showing footing depth, deck height, guard details and how the deck connects to the house. Pre-engineered railing systems usually come with their own details.

When a deck we build needs a permit, the drawings and application are prepared before a build date is booked — that is what we mean by permit-ready projects.

A practical checklist

  1. Measure the highest point of the planned deck surface above finished grade.
  2. Decide early whether it will ever be covered, roofed or enclosed.
  3. Check zoning setbacks and coverage for your address.
  4. Measure any trees near the deck footprint.
  5. Request utility locates before any digging.
  6. If a permit is needed, get drawings done before booking a build date.

Frequently asked questions

Do I need a permit for a deck that is under 24 inches high in Toronto? Usually not, if it is an uncovered platform no more than 60 cm above the adjacent finished grade, is not part of a required exit, and meets zoning. Check the height at every edge, not just by the door.

Does replacing deck boards need a permit? Replacing surface boards on an existing deck is generally treated as repair, not new construction. Rebuilding the structure, raising it or enclosing it is different. If you are unsure, ask Toronto Building before starting.

How high does a deck railing have to be in Ontario? For a deck serving one home, at least 900 mm where the deck is no more than 1,800 mm above finished ground, and 1,070 mm above that height, under OBC 9.8.8.3.

Can I attach my deck to my brick house? Not to brick veneer. The Building Code does not allow it; the deck must connect to the structure behind the veneer or be freestanding.

Can I build a privacy wall on my deck? In Toronto, a fence on an unroofed deck outside the front yard can generally be up to 2.0 m above the deck surface under Chapter 447, subject to the other conditions in the by-law.

Planning a deck?

The rules above are the starting point. The best decks also work with the rest of the yard — steps that land on a proper patio, lighting built into the stairs and rails, and a structure that is quiet and solid underfoot. See our custom decks page or request a quote.

This article is general information, current as of November 2026. By-laws change and every property is different; confirm requirements with your municipality before you build.

Sources

This guide is general information, not legal or engineering advice. Rules and fees change; confirm requirements for your property with your municipality.

About the author

Stephan Tosevski

Stephan Tosevski leads Mako Construction. Mako Construction has built high-end outdoor living spaces across Toronto & the GTA since 2016 — decks, cabanas, pergolas, landscaping, pools, outdoor kitchens, and hot tub and swim spa installations. Fully insured, with permit-ready projects and professional site management from consultation to turnover.

Related guides

Guide

Multi-Level Deck Design for Sloped GTA Lots

Multi level deck design for sloped GTA lots: how to plan levels, steps, guards, footings and drainage so a tiered deck works with your yard. See the checklist.