Design-Build vs General Contractor: Which Is Right for Your Toronto Backyard?
Design build vs general contractor for a Toronto backyard: how each model works, where they differ, and questions to ask before you hire. See which fits.

If you are planning more than a single deck or patio, one of the first decisions is how to hire. The two common routes are a design-build firm, where one company designs and builds, and the traditional route, where a designer produces drawings and a general contractor (or several trades) builds from them. This guide compares design build vs general contractor for a Toronto backyard, so you can choose the model that suits your project, your budget and how involved you want to be.
If you are weighing a larger project, our full backyard renovation page shows how we approach it as design-build.
What "design-build" and "general contractor" actually mean
Design-build means one company is responsible for both the design and the construction. The person sketching the layout is working with the people who will pour the footings, set the stone and frame the structure. There is one contract and one point of contact.
The separate-contractor route splits those jobs. A landscape designer, architect or deck designer prepares plans. You then collect prices from one or more builders, and a general contractor coordinates the trades that build the project. In a variation, the homeowner coordinates the trades directly.
Neither model is automatically better. They solve different problems, and the right choice depends on the shape of your project.
How the design-build process works for a backyard
A landscape design build process usually follows the same broad sequence, whatever the company:
- Consultation and site visit. The goals, the way the family uses the yard, access, grades, trees and budget range are discussed.
- Concept design. A layout is developed for the yard's zones, such as lounging, dining, cooking and swimming.
- Design development. Materials, structures, lighting and planting are chosen, and the plan is refined against the budget.
- Approvals. The project is checked against zoning and building rules, and any permits the scope calls for are identified.
- Construction. Utilities are located, the site is excavated and prepared, structures are built, and finishes go in.
- Turnover. A walk-through at the end, with finishing touches.
At Mako, the process has four steps, as set out on our home page:
- Consult & Site Walk
- Design & Budget Alignment
- Build & Weekly Updates
- Final Detail & Turnover
Design and budget alignment happens before anything is built, so decisions about materials, structures and services are made once, in the right order: services and drainage before paving, footings before decking, conduit before lighting. How long planning and each stage take depends on the size and complexity of the job. On a deck project, a permit-ready drawing set usually takes 2–3 weeks after design sign-off.
At Mako, a full backyard renovation is planned as one design and built by one team that manages the site from consultation to turnover.
The benefits of design build
The benefits of design build come mostly from keeping design and construction close together.
One plan, one team
When a deck, patio, pergola, outdoor kitchen and pool are designed together, they relate to each other. Steps land where the patio begins, the kitchen sits under the shade structure, and lighting is planned before the trenches are dug rather than added afterwards.


Budget is part of the design conversation
A designer who also builds has to live with the numbers. The plan is shaped around a realistic budget from the first meeting, instead of being drawn first and priced later. At Mako, projects are planned around the budget bands on the quote form: Under $25k, $25–50k, $50–100k, $100–200k, $200k+, and Not sure yet / need guidance. These are full-project bands, not item prices.
Fewer hand-offs
Every hand-off between designer, contractor and trades is a place where information gets lost. With design-build, the person who understood the intent of a detail is closer to the person building it.
Clearer accountability
If a drawing and the site disagree, someone has to decide. With one company, that decision happens inside one team. Under a split model, it can turn into a question of whether the design or the build was at fault.
Earlier site knowledge
Builders know things that do not show on a plan: how much access a machine needs through a side gate, whether clay soil will need extra drainage, and how a grade change affects footings. Having that input during design avoids redesigns once work begins.
Where a general contractor route can make sense
Design-build is not the right answer for every project. A separate designer and contractor may suit you when:
- You want an independent design. Some homeowners want a designer who has no stake in the construction method or the price.
- The design is already done. If you have finished drawings from an architect or landscape designer, you may simply want builders to price them.
- You want to compare bids line by line. A fully drawn set of plans lets several builders quote the same scope, which makes comparisons easier.
- The project is a single trade. A straightforward repair or replacement does not need a design phase.
- You enjoy managing the project. If you want to coordinate the trades yourself, a split model gives you that control.
The trade-off is that you carry more of the coordination, and a design that was not priced during development can come back over budget.
Design build vs general contractor at a glance
| Design-build | Designer + general contractor | |
|---|---|---|
| Contracts | One company, one contract | Separate design and construction agreements |
| Design and budget | Developed together | Drawn first, priced afterwards |
| Coordination | Handled by the company | Handled by the contractor, or by you |
| Independent design | Design comes from the builder | Designer is independent of the builder |
| Competing bids | Harder to compare like for like | Easier once plans are complete |
| Best for | Multi-feature, full-yard projects | Finished plans, single trades, hands-on owners |
What to ask before you hire either way
Whichever route you choose, ask these questions of any company:
- Who designs, who builds, and who is on site day to day?
- What is included in the price, and what is excluded?
- How are changes handled once construction starts?
- How is the schedule set, and what happens if weather delays work?
- Which trades are done in-house, and which are subcontracted?
- What insurance does the company carry? Ask any contractor about WSIB coverage and warranties as well.
- How are payments staged?
Our guide on how to choose a backyard contractor in Toronto goes through twelve questions in more detail.
On the licensed trades: Mako doesn't personally hold pool, gas or electrical licences; that work is done by our licensed partner subcontractors. Whichever company you hire, ask who holds the licence for each regulated trade.
Permits, zoning and utilities: ask how they are handled
The rules that apply to a backyard project do not change with the hiring model. The City of Toronto's list of when a building permit is required includes constructing a deck more than 60 centimetres (24 inches) above ground and building an accessory structure larger than 10 square metres (107 square feet), such as a pool house or cabana, and the same page notes that compliance with the Zoning By-law is required even where no permit is. Other municipalities have their own rules, so check the one where you live.
Utility locates are also required before digging. According to Ontario Dig Authority, you must request a public utility locate before you dig, and a single-address request is completed within five business days. Private lines such as gas to a barbecue or electrical to a shed are not part of the public locate process and need a private locate.
Whichever model you choose, ask your builder how these steps are handled at the estimating stage so nothing is discovered halfway through.
Which model suits which project
A rough guide:
- A full-yard project with several features (deck, patio, shade structure, kitchen, pool, lighting) generally benefits from design-build, because the pieces depend on each other.
- A single structure such as a replacement deck can work well with either model. See our deck permit guide for Toronto for what to check first.
- A fixed set of existing drawings often points towards a general contractor route, although Mako can also build from plans drawn by others.
- A tight, defined budget is easier to manage when design and pricing happen together.
For help sequencing a bigger project, read our guide to planning a full backyard renovation.
Frequently asked questions
Is design-build more expensive than hiring a general contractor?
Not necessarily. The cost depends on scope, materials, access and finishes, not the hiring model. Design-build can reduce redesign and rework because design and price are developed together, but a fully drawn set of plans also lets several builders bid on the same scope. Compare what is included, not only the totals.
Can I use my own designer with a design-build company?
It depends on the company. Some design-build firms only build their own designs. Mako can build from plans drawn by others, such as an architect or landscape designer. If you already have plans, mention them when you first get in touch so they can be part of the estimate.
Who is responsible if the design and the build do not match?
Under design-build, one company typically owns both sides, so it is responsible for resolving it. With separate designers and contractors, the answer depends on the contracts, so ask each party to explain their role before signing.
Does design-build mean I have less say in the design?
No. A good design-build process is collaborative, with the homeowner approving the layout and materials before construction starts. The difference is that the builder's knowledge is part of those decisions from the start.
Do I still need a permit with design-build?
The hiring model does not change whether a project needs one. That depends on the work and the municipality, so check your city's rules and ask your builder how they are handled during estimating.
Start with a conversation
If your project spans more than one part of the yard, a design-build approach may save you coordination and surprises. Contact Mako Construction and tell us what you are planning, and we will talk through the scope, the budget band and what the process would look like for your yard.
This article is general information. By-laws change and every property is different; confirm requirements with your municipality before you build.
Sources
- toronto.ca/services-payments/building-construction/building-permit/before-you-ap...
- ontariodigauthority.ca/locates-overview/
This guide is general information, not legal or engineering advice. Rules and fees change; confirm requirements for your property with your municipality.
About the author
Stephan Tosevski
Stephan Tosevski leads Mako Construction. Mako Construction has built high-end outdoor living spaces across Toronto & the GTA since 2016 — decks, cabanas, pergolas, landscaping, pools, outdoor kitchens, and hot tub and swim spa installations. Fully insured, with permit-ready projects and professional site management from consultation to turnover.
Related guides
Guide
Does a Backyard Upgrade Add Value to a Toronto Home?
Backyard renovation ROI in Toronto: what makes an outdoor upgrade add value, which projects tend to pay back in daily use, and the mistakes that cost you.
Guide
Minor Variances for Backyard Projects in Toronto: The Committee of Adjustment
Minor variance in Toronto explained for backyard projects: when the Committee of Adjustment gets involved, the four tests and the steps. Read the guide.
Guide
Toronto Building Permit Process for Backyard Projects: Steps, Timelines and Inspections
The Toronto building permit process for backyard projects: when a permit is needed, review times and inspections, per the City. Know the steps first.
Guide
Backyard Drainage Solutions for Toronto Clay Soil
Backyard drainage solutions for Toronto clay soil: grading, downspouts, French drains, swales and rain gardens, plus City rules to check. See what works.
See also our Full Backyard Renovations service.