Toronto Building Permit Process for Backyard Projects: Steps, Timelines and Inspections
The Toronto building permit process for backyard projects: when a permit is needed, review times and inspections, per the City. Know the steps first.

Most backyard projects raise the same early question: what does the Toronto building permit process actually involve, and how long will it add to the schedule? The answer depends on what you are building, but the steps are the same each time. This guide walks through them in plain language, using the City of Toronto's own published information, so you can plan a yard project with realistic expectations.
If you are planning a larger yard transformation, our backyard renovation service is where design and construction come together. This article covers the City side of it. It applies to the City of Toronto only; other municipalities run their own process.
Start here: does your project need a permit?
According to the City of Toronto's "When Do I Need a Building Permit?" page, a permit is required under the Building Code Act for the construction or demolition of a new building, an addition, or a material alteration of any building or structure. The City's list of common projects that need one is not exhaustive, but several items matter in a backyard:
- Constructing a deck more than 60 centimetres (24 inches) above ground.
- Enclosing an existing deck, porch or patio of any size.
- Constructing an accessory structure larger than 10 square metres (107 square feet), such as a pool house or cabana. The City adds that an accessory structure that is attached to an existing building, or has plumbing, needs a permit regardless of size.
- Constructing a retaining wall more than one metre (3 feet 3 inches) high, where it is on or adjacent to public property, building entrances, or private property accessible to the public.
The same page lists work that does not need a building permit, including an uncovered platform such as a deck whose finished level is not more than 60 cm above the adjacent finished grade (and which meets the other conditions listed), and a retaining wall on private property that is not accessible to the public or is under one metre high. The City is firm on one point: even when no building permit is needed, compliance with the Zoning By-law is still required.
For specific structures, see our guides to deck permits in Toronto, pergola permits in Toronto and cabana and pool house permits.
The Toronto building permit process, step by step
The City describes the process under its BuildSafeTO page. In summary:
- Determine whether your project requires a permit. Use the City's list above, and contact Toronto Building if you are unsure.
- Prepare the application using the City's Building Permit Application Guides, which set out the required documents, forms and fees for each project type.
- Submit the application and documents to the City by email at bldapplications@toronto.ca or through the Toronto Building Intake Portal. The application guide confirms which route applies.
- Intake review. City staff review the submission within one business day to decide whether it is sufficient to be an application. You then receive a Submission Status Letter. If the application is sufficient, the letter requests payment of initial fees and a Plan Examiner is assigned. If it is insufficient, the letter lists what is missing, and review cannot start until it is provided.
- Plan review for Zoning and Building Code compliance.
- Permit issued. Once the review is complete, the application complies, and all fees are paid, the permit is issued electronically. If additional fees are owed, the City notifies you by email and they must be paid before issuance.
- Construction and inspections. Work can begin once the permit has been received, and a final inspection is scheduled at the end to close the permit.
Building permit Toronto application: what a complete package looks like
The City says missing submission requirements are the most common cause of delays in permit issuance. Its review-streams page defines a complete application as including:
- The completed application form.
- One set of plans and specifications.
- An issued Zoning Applicable Law Certificate, along with confirmation that all applicable law has been satisfied.
- Payment of all fees.
The City states that applications without an issued Zoning Applicable Law Certificate are considered incomplete, and that no review time frame applies to incomplete applications.
Other tips from the City's page are worth repeating:
- Include the zoning declaration and tree declaration forms, which the City says are frequently overlooked.
- Submit properly formatted drawings. The City says sketches are not accepted, and drawings must be flattened and combined in a single PDF.
- Allow time for back-and-forth, which the City says may be needed before the documents satisfy the requirements.
Who may prepare the drawings is set by the Province. The City explains that, unless the property owner has the required drafting skills and knowledge of the Ontario Building Code, a qualified designer must prepare them. That means someone with a Building Code Identification Number (BCIN) or an Ontario Association of Architects or Professional Engineers Ontario designation.
How long does a building permit take in Toronto?
The City publishes service standards for complete applications. As published on its Customer Service Standards page and its review-streams page in November 2026:
| Application type | Review standard for a complete application |
|---|---|
| House | 10 business days |
| Small building | 15 business days |
| Large building | 20 business days |
| Complex building | 30 business days |
| Fastrack applications for small residential projects | Five business days |
The House Stream covers detached, semi-detached and row houses with not more than two dwelling units, and also ancillary buildings. The City also runs Express Services for certain stand-alone residential projects, including decks, with a goal of review within three business days after the permit has been taken in.
Two cautions apply. These are review standards for complete applications, not guaranteed permit dates, and notices, corrections or outstanding approvals sit outside them. The figures can also change, so confirm them on the City's pages. Build some slack into your schedule, and treat review time as only one part of the lead time for design, drawings and booking a build slot.
Other approvals that can sit alongside a building permit
A building permit is not the only approval a backyard project may need. The City's BuildSafeTO page notes that almost all electrical work in Ontario requires an electrical permit from the Electrical Safety Authority (ESA), and that this is obtained separately from a building permit. Lighting, outdoor kitchens and hot tub feeds are typical backyard examples. Mako doesn't personally hold electrical licences; that work is done by our licensed partner subcontractors.
Trees are another consideration. The City's application tips include a tree declaration form, and our article on building near protected trees in Toronto explains the City's rules in more detail. If a project does not meet the Zoning By-law, a minor variance may be involved, which we cover in our guide to minor variances for backyard projects.
Building permit Toronto inspection: what to expect
Once a permit is issued, inspections follow the work. The City says that holders of a building permit can request, cancel or reschedule an inspection 24/7 through the Toronto Building Inspection Requests online portal. Inspections are conducted Monday to Friday, 8:30 a.m. to 4:30 p.m. To request one online you need the permit number and the contact details of the person who will be on site to meet the inspector. Requests can also be made by phone at 416-338-0700 during the same hours.
For mandatory permit inspections, the City's service standard is two business days, starting on the next business day after the request is received. A final inspection is scheduled at the end of the project to close the permit.
Two practical habits help: know which stages must be inspected before they are covered up, and ask Toronto Building if the permit documents do not make that clear; and have someone available on site at the booked time.
Common mistakes that slow a permit down
- Assuming no permit means no rules. Zoning still applies to work that is exempt from a building permit.
- Submitting an incomplete package. Missing forms, an absent zoning certificate or drawings that do not meet the City's format are the usual causes.
- Starting before the permit is in place. The City warns that failing to obtain required permits can result in costly construction delays, legal action and the removal of work already completed.
- Ignoring noise hours. The City lists permitted construction noise hours as Monday to Friday 7 a.m. to 7 p.m. and Saturday 9 a.m. to 7 p.m., with none on Sundays or statutory holidays.
How permits fit into planning your project
Permit review is one of several steps in a design-led build. Design, drawings, zoning checks, material selection and scheduling all affect the timeline. For Mako projects, pricing is set during estimating; the only figures we publish are the full-project budget bands on our consultation form: Under $25k, $25–50k, $50–100k, $100–200k, $200k+, and Not sure yet / need guidance. Permit costs are one of the factors that shape a project's total.
Questions to settle early with any builder: which parts of the project trigger a permit and which only need zoning compliance, whether drawings are needed, how the schedule accounts for review time and inspections, and what happens if the City issues a notice.
Frequently asked questions
How long does a building permit take in Toronto?
The City's published standards for complete applications are 10 business days for a house, 15 for a small building, and 20 or 30 for large or complex buildings, with a five-business-day standard for fastrack small residential projects. These are review times for complete applications, not guarantees, and they can change. Check the City's pages for current figures.
Do I need a permit for a deck in Toronto?
According to the City, a permit is required for a deck more than 60 cm (24 inches) above ground. An uncovered platform at or below that height, meeting the City's other listed conditions, does not need a building permit, but it must still comply with the Zoning By-law. Confirm your plan with Toronto Building.
How do I book a building inspection in Toronto?
Permit holders can use the City's online Inspection Request portal 24/7, or phone 416-338-0700 Monday to Friday, 8:30 a.m. to 4:30 p.m. You need the permit number and the contact details of the person who will meet the inspector on site.
Do I need other approvals besides a building permit?
Possibly. Almost all electrical work in Ontario requires an ESA electrical permit, which is separate from a building permit, and zoning and tree rules may also apply. Ask Toronto Building about your specific project.
Plan your project with the process in mind
A clear picture of the steps makes the whole project calmer. If you are weighing a deck, cabana, pool or full yard renovation, contact Mako Construction and tell us what you have in mind, and we will talk through the scope, the budget band and how the pieces fit together.
This article is general information about the City of Toronto's published process, current as of November 21, 2026. Rules, review standards and fees change and every property is different; confirm requirements with Toronto Building before you build.
Sources
- toronto.ca/services-payments/building-construction/building-permit/
- toronto.ca/services-payments/building-construction/building-permit/before-you-ap...
- toronto.ca/services-payments/building-construction/building-permit/before-you-ap...
- toronto.ca/services-payments/building-construction/building-permit/before-you-ap...
- toronto.ca/city-government/accountability-operations-customer-service/city-admin...
- toronto.ca/services-payments/building-construction/building-permit/after-you-app...
This guide is general information, not legal or engineering advice. Rules and fees change; confirm requirements for your property with your municipality.
About the author
Stephan Tosevski
Stephan Tosevski leads Mako Construction. Mako Construction has built high-end outdoor living spaces across Toronto & the GTA since 2016 — decks, cabanas, pergolas, landscaping, pools, outdoor kitchens, and hot tub and swim spa installations. Fully insured, with permit-ready projects and professional site management from consultation to turnover.
Related guides
Guide
Does a Backyard Upgrade Add Value to a Toronto Home?
Backyard renovation ROI in Toronto: what makes an outdoor upgrade add value, which projects tend to pay back in daily use, and the mistakes that cost you.
Guide
Minor Variances for Backyard Projects in Toronto: The Committee of Adjustment
Minor variance in Toronto explained for backyard projects: when the Committee of Adjustment gets involved, the four tests and the steps. Read the guide.
Guide
Design-Build vs General Contractor: Which Is Right for Your Toronto Backyard?
Design build vs general contractor for a Toronto backyard: how each model works, where they differ, and questions to ask before you hire. See which fits.
Guide
Backyard Drainage Solutions for Toronto Clay Soil
Backyard drainage solutions for Toronto clay soil: grading, downspouts, French drains, swales and rain gardens, plus City rules to check. See what works.
See also our Full Backyard Renovations service.